As part of its 2016 compliance audit program, the Board randomly selected the Coast Mountain Resource District for the location of a full scope compliance audit. Within the district, the Board selected Forest Licence (FL) A16884, held by Canada Resurgence Developments Ltd. (CRD) for audit.
CRD’s operations under FL A16884 are near Bowser Lake and north in the Bell Irving watershed. Most of the operations are adjacent to Highway 37N (the Stewart–Cassiar Highway) and the Bell-Irving River north of Meziadin Junction. Operations are primarily on gentle ground. FL A16884 has an allowable annual cut of 291 712 cubic metres and harvested approximately 142 930 cubic metres during the two-year audit period.
The audit identified two significant non-compliances related to structure installation and silviculture obligations. CRD constructed two structures over seven metres in length instead of two, four metre long log culverts. Consequently, the structures are considered log stringer bridges which are subject to various requirements of the Forest Planning and Practices Regulation (FPPR). Because CRD was planning to install a log culvert, they did not comply with the FPPR. In addition, CRD did not update the forest cover information and could not confirm that free growing was achieved on five cutblocks.
CRD has stated that it will remove the structures in 2017 and will inspect all new wooden box culvert installation. CRD also stated that it will complete free-growing surveys and update forest cover information for the five cutblocks in 2017.
March 2017
Natural Resource Region
District
Related News Release